The current position: Home > Company News > Concrete mix ratio management

From: Linyi Xingang Concrete Co., Ltd. Release date: 2017-11-30
Core tip: The construction unit is issuing a production task without specifying the pumping height or the length of the pumping horizontal pipe, but the proportion of ordinary 5-31.5mm crushed stone and ordinary pumping slump is used to open the pipe, causing the pipe to burst.
The pumping height and length did not adjust the mix ratio in time.
1. A serious blockage occurred in the supply process of the basement floor C40P8 of a project, and the length of the pump pipe on site exceeded 200 meters.
2. During the construction of a column wall in a project, the pipe blocking phenomenon occurred many times.
Analysis of reasons: The construction unit is issuing a production task without specifying the pumping height or the length of the pumping horizontal pipe, and the proportion of ordinary 5-31.5mm crushed stone and ordinary pumping slump is opened to cause pipe blocking and tube burst.
Corrective Action:
1) When the pumping height exceeds 20 layers or 60 meters, the particle size of 5-25mm crushed stone must be indicated, and the slump should be ≥160mm.
2) The pump trucks should be laid horizontally and vertically to minimize the number of elbows and variable pipes. If the length of the horizontal pipe exceeds 150 meters, the slump should be ≥160mm.
The change of sand fineness modulus affects the slump of concrete.
The slump is too large during the construction of a project, and the concrete is segregated.
Analysis of reasons: The river sand fineness modulus becomes larger, the specific surface area decreases, and the slump becomes larger.
Corrective measures: The river sand entering the factory should be mixed uniformly. If the detection fineness modulus changes greatly, the construction mix ratio should be adjusted in time.

Hot search keywords
Shandong smart charging pile manufacturer Linyi logo Tongmen manufacturer Linyi cardboard box lead smelting furnace Hanzhong compressor repair Linyi car rental refractory brick GRC spraying machine Linyi concrete
Home | About Us | Corporate Culture | News Center | Corporate Announcement | Project Cases | Consultant Service | Contact Us |
share to:
about us
about us
company culture
contact details
Graphic case
Aegean Project
honor certificate
Huaqian City Square
Bihai Ark Project
Golden Mile Washington Project
Qiluyuan Plaza Project
Online consultation
Submit a question
View reply
Information knowledge
company news
Industry news
announcement
Please scan the mobile website
Copyright ? 2017-2018 Linyi Xingang Concrete Co., Ltd. All Rights Reserved
Phone: 0539-5630100
Address: West of Mengshan North Road and Jinyuan Road, Zaoyuan Town, Linyi City Click: 123222